What Is Malaysia’s Solar ATAP Programme?
The Solar Accelerated Transition Action Programme, commonly known as Solar ATAP, is Malaysia’s rooftop solar programme for eligible electricity consumers in Peninsular Malaysia. It allows consumers to install solar photovoltaic systems for their own electricity use and export eligible surplus generation to the grid for an energy offset under the programme’s rules.
What Is the Solar Accelerated Transition Action Programme?
Solar ATAP is a consumer-based rooftop solar initiative introduced to increase the use of available rooftop space for renewable-energy generation. It continues the general self-consumption and surplus-export concept used under Malaysia’s earlier Net Energy Metering programme, with programme-specific eligibility, capacity, assessment and offset rules.
Self-Consumption First
Solar electricity generated at the premises is used to support the consumer’s own electricity demand.
Surplus Export
Eligible solar electricity that is not immediately consumed may be exported to the electricity grid.
Energy Offset
Eligible exported energy may create an electricity-bill offset based on the applicable Solar ATAP mechanism and rate.
Rooftop Renewable Energy
The programme is intended to support greater use of rooftop space for distributed solar generation.
How Does Solar ATAP Work?
Solar Generates Electricity
Rooftop solar panels convert sunlight into DC electricity during daylight hours.
The Inverter Converts Power
The inverter converts solar DC electricity into AC electricity that can be used by the premises.
The Premises Uses Solar First
Available solar generation helps supply the building’s active electrical loads.
Surplus May Be Exported
Solar energy exceeding the premises’ immediate demand may flow to the grid through the approved connection.
Eligible Exports Are Measured
The metering arrangement records eligible energy imported from and exported to the grid.
The Bill Applies the Offset
Eligible exported energy is treated according to the applicable Solar ATAP offset and billing mechanism.
Why Is Self-Consumption Important under Solar ATAP?
The direct use of solar electricity at the premises can be financially important because it reduces the amount of electricity that must be imported from the grid during solar-generating hours.
Daytime Loads
Air conditioning, machinery, refrigeration, pumps, office equipment and other daytime loads can use solar electricity directly.
Load Matching
A system designed around the premises’ daytime demand may achieve a higher self-consumption ratio.
Surplus Management
Oversized systems may export a larger share of generation rather than using it directly at the premises.
System Sizing
The most suitable size should consider consumption data, roof conditions, programme limits and expected export behaviour.
Who Is Eligible to Apply for Solar ATAP?
Eligibility is subject to the official programme guidelines and the consumer’s electricity-account and installation status.
- Registered TNB consumer
- Premises located within the applicable TNB supply area
- Eligible domestic or non-domestic electricity account
- No conflicting registration under an existing NEM arrangement
- No conflicting registration under the SelCo programme
- No disqualifying existing solar PV arrangement
- Complies with technical connection requirements
- Complies with programme application requirements
- Appoints a Registered PV Service Provider
- Provides complete supporting documents
- Completes required electrical installation work
- Completes required testing and commissioning
- Obtains technical assessment where applicable
- Complies with licensing requirements where applicable
- Uses an approved interconnection arrangement
- Signs the required Solar ATAP contract
What Are the Solar ATAP Capacity Limits?
| Consumer Category | General Capacity Limit | Main Condition |
|---|---|---|
| Domestic — Single Phase | Up to 5 kW | Subject to applicable connection and programme requirements |
| Domestic — Three Phase | Up to 15 kW | Subject to applicable connection and programme requirements |
| Non-Domestic | Up to 100% of Maximum Demand | Subject to technical assessment and system-design requirements |
| Maximum Non-Domestic Limit | 1,000 kW | The project cannot exceed the programme’s overall maximum limit |
Which Solar ATAP Technical Assessments May Be Required?
The assessment requirement depends on consumer category, supply type, connection voltage and proposed solar capacity.
| Category or Capacity | Possible Assessment | Published Study Fee |
|---|---|---|
| Domestic Single Phase above 5 kW | Connection Confirmation Check | RM1,000 |
| Domestic Three Phase above 15 kW | Connection Confirmation Check | RM1,000 |
| Non-Domestic from 1 kW to 72 kW | No listed CAS study under the published table | No study fee listed |
| Non-Domestic above 72 kW to 180 kW | Connection Assessment Study | RM1,000 |
| Non-Domestic above 180 kW to 425 kW | Connection Assessment Study | RM5,000 |
| Non-Domestic above 425 kW to 1 MW | Connection Assessment Study | RM8,000 |
| High-Voltage Connection | Power System Study | RM15,000 |
How Long Is the Solar ATAP Contract?
The Solar ATAP contract period is ten years from the contract’s commencement date.
How Do Consumers Apply for Solar ATAP?
Solar ATAP applications are submitted through SEDA Malaysia’s eATAP online system by an appointed Registered PV Service Provider.
Review Electricity Usage
The consumer provides electricity bills, account information and consumption data.
Appoint an RPVSP
A Registered PV Service Provider assesses the site and prepares the proposed solar design.
Complete Technical Assessment
The required connection assessment or power-system study is completed where applicable.
Submit through eATAP
The registered provider submits the relevant Solar ATAP application and supporting information.
Install and Commission
The approved solar system is installed, tested and commissioned by the relevant qualified parties.
Complete TNB Contract and Meter Process
Required documentation, contract, meter and electricity-supply processes are completed before programme operation begins.
Which Documents May Be Required?
- Solar ATAP certificate
- Solar ATAP contract
- Electricity-supply application form
- Solar ATAP terms and conditions
- Consumer identification documents
- Company authorisation letter, where applicable
- SSM company information, where applicable
- Representative identification documents
- Generating licence, where legally required
- Form G
- Form H
- Single-line diagram
- Electrical test results
- Testing and commissioning form
- Competent-person certificate
- Registered electrical-contractor documents
- Technical-assessment approval, where applicable
- Customer load-profile information, where applicable
How Can a Solar ATAP System Be Purchased?
Outright Cash Purchase
The site owner pays the system cost and normally becomes the owner of the installed solar equipment.
Loan or Credit Facility
The site owner finances the system through an approved lender, credit facility or payment arrangement.
Power Purchase Agreement
An investor owns the system and the consumer pays for the solar electricity generated according to the agreed energy rate.
Solar Leasing
The consumer pays an agreed rental amount for use of the system, with ownership treatment determined by the lease agreement.
| Purchase Model | Typical System Owner | Main Payment Method |
|---|---|---|
| Cash Purchase | Site owner | One-time system payment |
| Loan or Credit Facility | Site owner, subject to financing terms | Scheduled financing repayment |
| Power Purchase Agreement | Registered solar investor | Payment based on solar electricity generated |
| Solar Lease | Depends on the lease period and agreement | Fixed or agreed rental payment |
How Does Solar ATAP Compare with NEM and SelCo?
| Programme | Main Concept | Surplus Export Treatment |
|---|---|---|
| Solar ATAP | Self-consumption with eligible surplus export | Energy offset under the Solar ATAP rules and contract period |
| Earlier NEM Programme | Self-consumption with net-energy offset arrangements | Determined by the applicable NEM category and contract |
| SelCo | Solar generation for self-consumption at the premises | Generally structured around self-use rather than an ATAP export offset |
What Are the Potential Benefits of Solar ATAP?
- Lower daytime grid-electricity imports
- Use of available rooftop space
- Renewable electricity generated at the premises
- Potential electricity-cost reduction
- Energy offset for eligible surplus exports
- Support for corporate sustainability targets
- Potential reduction in grid-energy dependence
- Improved visibility of energy consumption
- Potential use through outright purchase
- Potential access to PPA arrangements
- Potential access to solar leasing
- Scalable design for different consumer categories
- Support for Malaysia’s energy transition
- Potential compatibility with future energy management
- Potential long-term use after the contract period
- Greater focus on self-consumption after year ten
What Are the Main Solar ATAP Limitations?
- Eligibility is limited to qualifying consumers
- Programme applies within the relevant TNB supply area
- Domestic systems have defined capacity limits
- Non-domestic systems are linked to Maximum Demand
- Technical studies may be required
- Technical-study fees may apply
- Final approved capacity may be lower than proposed
- Export offsets are subject to programme rules
- The Solar ATAP contract period is ten years
- Export-offset treatment ends after the contract
- Installation requires qualified parties
- Meter and connection work may be required
- Approval does not guarantee financial savings
- Roof suitability must still be assessed
- Solar does not automatically provide blackout backup
- Programme rules may be updated
What Is the Difference between Solar100 and a Solar Provider?
| Solar100 | Solar Provider or Installer |
|---|---|
| Explains the general Solar ATAP framework | Checks the consumer’s site and project eligibility |
| Highlights common capacity and assessment requirements | Designs the proposed solar PV system |
| Helps users compare participating solar providers | Submits applications through the relevant official systems |
| Does not issue Solar ATAP approval | Coordinates supporting documents and technical submissions |
| Does not conduct utility technical assessments | Coordinates with the utility and appointed consultants |
| Does not guarantee approval, offsets or savings | Provides contractual installation and service responsibilities |
What Should You Ask before Applying for Solar ATAP?
- Is my TNB account eligible for Solar ATAP?
- Do I have any existing solar registration that affects eligibility?
- What is my electricity-supply type?
- What capacity can my premises apply for?
- Is the proposed system within the programme limit?
- Will a technical assessment be required?
- What assessment fee applies?
- Could the approved capacity be lower than the proposed capacity?
- How will the export energy offset be calculated?
- How will exported energy appear on my bill?
- What happens to unused offsets?
- What happens after the ten-year contract?
- Is the installer a current Registered PV Service Provider?
- Who will submit the eATAP application?
- Who will coordinate the TNB meter and contract process?
- Which documents must I sign?
- Which application and study fees are included?
- What happens if the application is rejected?
- When should installation begin?
- What warranties and O&M support are included?
What Information Should Be Prepared for a Solar ATAP Assessment?
- Recent TNB electricity bills
- TNB account number
- Registered account-holder details
- Property address
- Electricity tariff category
- Single-phase or three-phase supply
- Maximum Demand records, where applicable
- Monthly electricity consumption
- Daytime operating hours
- Daytime load profile
- Roof photographs
- Roof dimensions
- Roof type and condition
- Main switchboard photographs
- Electrical single-line diagram, if available
- Existing generator information
- Existing solar information
- Preferred purchase or financing model
Frequently Asked Questions
What does Solar ATAP mean?
Solar ATAP means the Solar Accelerated Transition Action Programme, Malaysia’s consumer-based rooftop solar programme introduced from 1 January 2026.
Can Solar ATAP consumers export excess solar electricity?
Yes. Eligible surplus generation may be exported to the grid and treated according to the programme’s energy-offset rules.
Who can apply for Solar ATAP?
Eligible registered TNB consumers that meet the programme, installation and account requirements may apply through an appointed Registered PV Service Provider.
What is the domestic Solar ATAP capacity limit?
The general domestic limit is up to 5 kW for single-phase supply and up to 15 kW for three-phase supply.
How long does the Solar ATAP contract last?
The Solar ATAP contract period is ten years from its commencement date. After that, the system operates strictly for self-consumption without the programme’s export offset.
How is a Solar ATAP application submitted?
The consumer appoints a Registered PV Service Provider, which submits the relevant application through SEDA Malaysia’s eATAP system.
Check Your Eligibility and Suitable Capacity under Solar ATAP
Send your recent TNB bill, property location, supply type, daytime usage, Maximum Demand information and roof details to compare Solar ATAP system proposals from participating registered solar providers.
Request and Compare Solar Quotes