What Is Malaysia’s Solar ATAP Programme?

Solar100 Malaysia Rooftop Solar Policy Guide

What Is Malaysia’s Solar ATAP Programme?

Last updated: July 2026

The Solar Accelerated Transition Action Programme, commonly known as Solar ATAP, is Malaysia’s rooftop solar programme for eligible electricity consumers in Peninsular Malaysia. It allows consumers to install solar photovoltaic systems for their own electricity use and export eligible surplus generation to the grid for an energy offset under the programme’s rules.

Quick Answer Solar ATAP started on 1 January 2026 as a continuation of Malaysia’s Net Energy Metering programme. Eligible registered TNB consumers can install rooftop solar for self-consumption and export surplus solar electricity to the grid for an energy offset. Domestic capacity is generally limited to 5 kW for single-phase supply and 15 kW for three-phase supply. Non-domestic systems may be sized up to 100% of the consumer’s Maximum Demand, subject to technical assessment, with a maximum limit of 1,000 kW. The Solar ATAP contract period is ten years.
SEDA Certified
SSM Registered
Gov Policy Compliant
O&M Support
Free Quote & Consult

What Is the Solar Accelerated Transition Action Programme?

Solar ATAP is a consumer-based rooftop solar initiative introduced to increase the use of available rooftop space for renewable-energy generation. It continues the general self-consumption and surplus-export concept used under Malaysia’s earlier Net Energy Metering programme, with programme-specific eligibility, capacity, assessment and offset rules.

Self-Consumption First

Solar electricity generated at the premises is used to support the consumer’s own electricity demand.

Surplus Export

Eligible solar electricity that is not immediately consumed may be exported to the electricity grid.

Energy Offset

Eligible exported energy may create an electricity-bill offset based on the applicable Solar ATAP mechanism and rate.

Rooftop Renewable Energy

The programme is intended to support greater use of rooftop space for distributed solar generation.

Solar ATAP Is Not a Cash-Generation Scheme: Its main purpose is to support self-consumption and provide an energy offset for eligible surplus exports according to the programme and electricity-billing rules.

Who Administers and Regulates Solar ATAP?

PETRA The Ministry of Energy Transition and Water Transformation is responsible for the programme at government-policy level.
Energy Commission Suruhanjaya Tenaga regulates the programme and issues the applicable guidelines.
SEDA Malaysia The Sustainable Energy Development Authority acts as the programme’s implementing agency and operates the eATAP application system.
TNB Tenaga Nasional Berhad manages relevant electricity-supply, interconnection, technical-assessment, metering, contract and billing processes.
Different Parties Have Different Responsibilities: Programme approval, technical connection, meter work, installation and electricity billing may not all be handled by the same organisation.

How Does Solar ATAP Work?

1

Solar Generates Electricity

Rooftop solar panels convert sunlight into DC electricity during daylight hours.

2

The Inverter Converts Power

The inverter converts solar DC electricity into AC electricity that can be used by the premises.

3

The Premises Uses Solar First

Available solar generation helps supply the building’s active electrical loads.

4

Surplus May Be Exported

Solar energy exceeding the premises’ immediate demand may flow to the grid through the approved connection.

5

Eligible Exports Are Measured

The metering arrangement records eligible energy imported from and exported to the grid.

6

The Bill Applies the Offset

Eligible exported energy is treated according to the applicable Solar ATAP offset and billing mechanism.

Solar ATAP Does Not Make Electricity Bills Automatically Zero: The final bill depends on electricity consumption, solar generation, timing of consumption, eligible exports, applicable offset rules and other electricity-bill components.

Why Is Self-Consumption Important under Solar ATAP?

The direct use of solar electricity at the premises can be financially important because it reduces the amount of electricity that must be imported from the grid during solar-generating hours.

Daytime Loads

Air conditioning, machinery, refrigeration, pumps, office equipment and other daytime loads can use solar electricity directly.

Load Matching

A system designed around the premises’ daytime demand may achieve a higher self-consumption ratio.

Surplus Management

Oversized systems may export a larger share of generation rather than using it directly at the premises.

System Sizing

The most suitable size should consider consumption data, roof conditions, programme limits and expected export behaviour.

Maximum Permitted Capacity Is Not Always the Best Economic Size: Consumers should compare system cost, daytime usage, roof constraints, expected generation and the applicable export-offset mechanism.

Who Is Eligible to Apply for Solar ATAP?

Eligibility is subject to the official programme guidelines and the consumer’s electricity-account and installation status.

  • Registered TNB consumer
  • Premises located within the applicable TNB supply area
  • Eligible domestic or non-domestic electricity account
  • No conflicting registration under an existing NEM arrangement
  • No conflicting registration under the SelCo programme
  • No disqualifying existing solar PV arrangement
  • Complies with technical connection requirements
  • Complies with programme application requirements
  • Appoints a Registered PV Service Provider
  • Provides complete supporting documents
  • Completes required electrical installation work
  • Completes required testing and commissioning
  • Obtains technical assessment where applicable
  • Complies with licensing requirements where applicable
  • Uses an approved interconnection arrangement
  • Signs the required Solar ATAP contract
Some Electricity Arrangements Are Not Eligible: Consumers that are also generators under certain arrangements, and TNB accounts registered under tenant sub-meters in a multi-tenant scheme, may not qualify under the programme.

What Are the Solar ATAP Capacity Limits?

Consumer Category General Capacity Limit Main Condition
Domestic — Single Phase Up to 5 kW Subject to applicable connection and programme requirements
Domestic — Three Phase Up to 15 kW Subject to applicable connection and programme requirements
Non-Domestic Up to 100% of Maximum Demand Subject to technical assessment and system-design requirements
Maximum Non-Domestic Limit 1,000 kW The project cannot exceed the programme’s overall maximum limit
Maximum Demand Matters for Non-Domestic Consumers: The allowable capacity is linked to the consumer’s Maximum Demand and may be reduced or conditioned by the technical assessment.

Which Solar ATAP Technical Assessments May Be Required?

The assessment requirement depends on consumer category, supply type, connection voltage and proposed solar capacity.

Category or Capacity Possible Assessment Published Study Fee
Domestic Single Phase above 5 kW Connection Confirmation Check RM1,000
Domestic Three Phase above 15 kW Connection Confirmation Check RM1,000
Non-Domestic from 1 kW to 72 kW No listed CAS study under the published table No study fee listed
Non-Domestic above 72 kW to 180 kW Connection Assessment Study RM1,000
Non-Domestic above 180 kW to 425 kW Connection Assessment Study RM5,000
Non-Domestic above 425 kW to 1 MW Connection Assessment Study RM8,000
High-Voltage Connection Power System Study RM15,000
The Assessment Can Affect the Final Approved Capacity: The electricity utility or appointed consultant may identify connection, protection, safety or capacity conditions that must be addressed before the project proceeds.
Fees and Assessment Requirements Can Be Updated: Applicants should confirm the latest official forms, thresholds and fees before making payment or finalising the proposed system capacity.

How Long Is the Solar ATAP Contract?

The Solar ATAP contract period is ten years from the contract’s commencement date.

During the Ten-Year Period Eligible surplus solar exports may receive the applicable energy offset under the Solar ATAP contract and billing rules.
After the Ten-Year Period The solar installation becomes strictly a self-consumption system at the premises.
No Continuing Export Offset After the contract period, excess exported energy does not receive the Solar ATAP offset under the expired arrangement.
No Continuing Roll-Over Any programme-specific roll-over treatment ends when the Solar ATAP contract period ends.
System Economics Should Extend beyond the Contract Period: The solar system may remain operational after ten years, but its financial value will depend more heavily on direct self-consumption once the Solar ATAP export-offset period ends.

How Do Consumers Apply for Solar ATAP?

Solar ATAP applications are submitted through SEDA Malaysia’s eATAP online system by an appointed Registered PV Service Provider.

1

Review Electricity Usage

The consumer provides electricity bills, account information and consumption data.

2

Appoint an RPVSP

A Registered PV Service Provider assesses the site and prepares the proposed solar design.

3

Complete Technical Assessment

The required connection assessment or power-system study is completed where applicable.

4

Submit through eATAP

The registered provider submits the relevant Solar ATAP application and supporting information.

5

Install and Commission

The approved solar system is installed, tested and commissioned by the relevant qualified parties.

6

Complete TNB Contract and Meter Process

Required documentation, contract, meter and electricity-supply processes are completed before programme operation begins.

The Registered Solar Provider Handles Important Submissions: Consumers should verify that the appointed company is listed as a current Registered PV Service Provider and understands the Solar ATAP process.

Which Documents May Be Required?

  • Solar ATAP certificate
  • Solar ATAP contract
  • Electricity-supply application form
  • Solar ATAP terms and conditions
  • Consumer identification documents
  • Company authorisation letter, where applicable
  • SSM company information, where applicable
  • Representative identification documents
  • Generating licence, where legally required
  • Form G
  • Form H
  • Single-line diagram
  • Electrical test results
  • Testing and commissioning form
  • Competent-person certificate
  • Registered electrical-contractor documents
  • Technical-assessment approval, where applicable
  • Customer load-profile information, where applicable
Incomplete Applications May Be Returned or Rejected: Consumer details, supporting documents, electrical forms and technical information should be checked before final submission.

How Can a Solar ATAP System Be Purchased?

Outright Cash Purchase

The site owner pays the system cost and normally becomes the owner of the installed solar equipment.

Loan or Credit Facility

The site owner finances the system through an approved lender, credit facility or payment arrangement.

Power Purchase Agreement

An investor owns the system and the consumer pays for the solar electricity generated according to the agreed energy rate.

Solar Leasing

The consumer pays an agreed rental amount for use of the system, with ownership treatment determined by the lease agreement.

Purchase Model Typical System Owner Main Payment Method
Cash Purchase Site owner One-time system payment
Loan or Credit Facility Site owner, subject to financing terms Scheduled financing repayment
Power Purchase Agreement Registered solar investor Payment based on solar electricity generated
Solar Lease Depends on the lease period and agreement Fixed or agreed rental payment
Solar ATAP Approval and Financing Are Separate Matters: Programme eligibility does not automatically mean that a loan, lease or power-purchase proposal is financially suitable.

How Does Solar ATAP Compare with NEM and SelCo?

Programme Main Concept Surplus Export Treatment
Solar ATAP Self-consumption with eligible surplus export Energy offset under the Solar ATAP rules and contract period
Earlier NEM Programme Self-consumption with net-energy offset arrangements Determined by the applicable NEM category and contract
SelCo Solar generation for self-consumption at the premises Generally structured around self-use rather than an ATAP export offset
Existing NEM Consumers Do Not Automatically Move to Solar ATAP: Existing programme rights and obligations remain subject to the consumer’s original approval, contract and applicable rules.

What Are the Potential Benefits of Solar ATAP?

  • Lower daytime grid-electricity imports
  • Use of available rooftop space
  • Renewable electricity generated at the premises
  • Potential electricity-cost reduction
  • Energy offset for eligible surplus exports
  • Support for corporate sustainability targets
  • Potential reduction in grid-energy dependence
  • Improved visibility of energy consumption
  • Potential use through outright purchase
  • Potential access to PPA arrangements
  • Potential access to solar leasing
  • Scalable design for different consumer categories
  • Support for Malaysia’s energy transition
  • Potential compatibility with future energy management
  • Potential long-term use after the contract period
  • Greater focus on self-consumption after year ten
Savings Are Not Guaranteed: Results depend on system cost, solar generation, electricity consumption, daytime load, applicable tariffs, offset rules, financing, downtime and maintenance.

What Are the Main Solar ATAP Limitations?

  • Eligibility is limited to qualifying consumers
  • Programme applies within the relevant TNB supply area
  • Domestic systems have defined capacity limits
  • Non-domestic systems are linked to Maximum Demand
  • Technical studies may be required
  • Technical-study fees may apply
  • Final approved capacity may be lower than proposed
  • Export offsets are subject to programme rules
  • The Solar ATAP contract period is ten years
  • Export-offset treatment ends after the contract
  • Installation requires qualified parties
  • Meter and connection work may be required
  • Approval does not guarantee financial savings
  • Roof suitability must still be assessed
  • Solar does not automatically provide blackout backup
  • Programme rules may be updated
Solar ATAP Is Only One Part of the Project: A suitable solar installation also requires sound engineering, roof assessment, equipment selection, financial evaluation, installation, testing, monitoring and maintenance.

What Is the Difference between Solar100 and a Solar Provider?

Solar100 Solar Provider or Installer
Explains the general Solar ATAP framework Checks the consumer’s site and project eligibility
Highlights common capacity and assessment requirements Designs the proposed solar PV system
Helps users compare participating solar providers Submits applications through the relevant official systems
Does not issue Solar ATAP approval Coordinates supporting documents and technical submissions
Does not conduct utility technical assessments Coordinates with the utility and appointed consultants
Does not guarantee approval, offsets or savings Provides contractual installation and service responsibilities

What Should You Ask before Applying for Solar ATAP?

  1. Is my TNB account eligible for Solar ATAP?
  2. Do I have any existing solar registration that affects eligibility?
  3. What is my electricity-supply type?
  4. What capacity can my premises apply for?
  5. Is the proposed system within the programme limit?
  6. Will a technical assessment be required?
  7. What assessment fee applies?
  8. Could the approved capacity be lower than the proposed capacity?
  9. How will the export energy offset be calculated?
  10. How will exported energy appear on my bill?
  11. What happens to unused offsets?
  12. What happens after the ten-year contract?
  13. Is the installer a current Registered PV Service Provider?
  14. Who will submit the eATAP application?
  15. Who will coordinate the TNB meter and contract process?
  16. Which documents must I sign?
  17. Which application and study fees are included?
  18. What happens if the application is rejected?
  19. When should installation begin?
  20. What warranties and O&M support are included?
Request a Written Solar ATAP Scope: The proposal should clearly identify the proposed capacity, expected self-consumption, estimated exports, application responsibilities, technical studies, fees, equipment, warranties and exclusions.

What Information Should Be Prepared for a Solar ATAP Assessment?

  • Recent TNB electricity bills
  • TNB account number
  • Registered account-holder details
  • Property address
  • Electricity tariff category
  • Single-phase or three-phase supply
  • Maximum Demand records, where applicable
  • Monthly electricity consumption
  • Daytime operating hours
  • Daytime load profile
  • Roof photographs
  • Roof dimensions
  • Roof type and condition
  • Main switchboard photographs
  • Electrical single-line diagram, if available
  • Existing generator information
  • Existing solar information
  • Preferred purchase or financing model

Frequently Asked Questions

What does Solar ATAP mean?

Solar ATAP means the Solar Accelerated Transition Action Programme, Malaysia’s consumer-based rooftop solar programme introduced from 1 January 2026.

Can Solar ATAP consumers export excess solar electricity?

Yes. Eligible surplus generation may be exported to the grid and treated according to the programme’s energy-offset rules.

Who can apply for Solar ATAP?

Eligible registered TNB consumers that meet the programme, installation and account requirements may apply through an appointed Registered PV Service Provider.

What is the domestic Solar ATAP capacity limit?

The general domestic limit is up to 5 kW for single-phase supply and up to 15 kW for three-phase supply.

How long does the Solar ATAP contract last?

The Solar ATAP contract period is ten years from its commencement date. After that, the system operates strictly for self-consumption without the programme’s export offset.

How is a Solar ATAP application submitted?

The consumer appoints a Registered PV Service Provider, which submits the relevant application through SEDA Malaysia’s eATAP system.

The information on this page is provided for general educational and comparison purposes. It is not an official Solar ATAP approval, legal interpretation, electricity-billing calculation, technical connection approval, programme guarantee, financial guarantee or confirmation that a consumer or project is eligible. Eligibility, capacity, technical studies, fees, export treatment, contract requirements and application procedures depend on the latest official guidelines, utility requirements, consumer category, electricity account, Maximum Demand, system design and site conditions. Solar100 is a discovery and comparison platform. It is not PETRA, the Energy Commission, SEDA Malaysia, TNB, a solar installer, electricity utility, regulator, engineering consultant or government authority. Consumers should verify the latest requirements with the relevant authorities and obtain a site-specific design, technical assessment, financial analysis and written proposal from a qualified Registered PV Service Provider before proceeding.