Why Must Applicants Appoint a SEDA Registered PV Service Provider?

Solar100 Malaysia Solar ATAP Application Guide

Why Must Applicants Appoint a SEDA Registered PV Service Provider?

Last updated: July 2026

Solar ATAP applicants must appoint a SEDA Malaysia Registered PV Service Provider, commonly called an RPVSP, because the programme requires a recognised solar service provider to prepare, coordinate and submit key technical and application information. The RPVSP also supports the project through technical assessment, system design, installation, testing, commissioning, metering and commercial-operation procedures.

Quick Answer The official Solar ATAP workflow instructs both domestic and non-domestic applicants to appoint an RPVSP listed in SEDA Malaysia’s directory. The RPVSP helps confirm the proposed capacity, prepare technical documents, coordinate a CCC, CAS or PSS where required, submit the eATAP application, respond to application queries and complete post-approval procedures. Registration provides an official service-provider framework, but it does not automatically guarantee the lowest price, flawless workmanship, approval, savings or long-term business continuity. Applicants must still compare the provider’s proposal, qualifications, warranties and service responsibilities.
SEDA Certified
SSM Registered
Gov Policy Compliant
O&M Support
Free Quote & Consult

Why Does Solar ATAP Require Applicants to Appoint an RPVSP?

A grid-connected solar application involves more than purchasing panels. It requires a proposed system capacity, electrical design, connection assessment, supporting drawings, application data, qualified endorsements, installation records, meter procedures and testing information.

The RPVSP acts as the main solar-project coordinator responsible for organising these elements and presenting the application through the official Solar ATAP process.

Structured Application

The provider prepares the project information in the format required for Solar ATAP verification.

Technical Coordination

The provider coordinates the system design, technical endorsements and required connection studies.

Regulatory Traceability

The application identifies the SEDA-registered company responsible for the proposed solar service.

Project Continuity

The same provider can coordinate the project from application through installation and commercial operation.

The RPVSP Is Part of the Official Workflow: The appointment is not merely an optional sales arrangement. It is an identified step in the Solar ATAP domestic and non-domestic application workflows.

What Is a SEDA Registered PV Service Provider?

An RPVSP is a photovoltaic service company listed in SEDA Malaysia’s Registered PV Service Provider directory for the applicable registration period.

The application form records the RPVSP’s company name, business registration information, SEDA registration status, registration certificate number, office address and contact information. It also identifies relevant electrical-contractor and qualified-person details where applicable.

Registered Company The provider appears under SEDA Malaysia’s applicable RPVSP registration framework.
Application Coordinator The provider prepares and manages the solar application and supporting documents.
Technical Service Provider The provider coordinates system design, equipment information and technical compliance.
Project Contact The provider acts as a key contact between the applicant and the relevant implementation, utility and technical parties.
Registered Does Not Mean Every Provider Is Identical: Companies may differ substantially in engineering capability, equipment, workmanship, price, warranty support, financial strength and response time.

What Does the RPVSP Do before the Solar ATAP Application?

  • Reviews the applicant’s electricity account
  • Checks the domestic or non-domestic tariff category
  • Confirms the supply-voltage level
  • Reviews single-phase or three-phase supply
  • Reviews Maximum Demand where applicable
  • Assesses recent electricity consumption
  • Reviews daytime electricity usage
  • Assesses available roof or installation space
  • Checks the proposed point of interconnection
  • Proposes an appropriate solar capacity
  • Selects proposed solar modules and inverters
  • Prepares preliminary electrical design information
  • Identifies whether a technical study is required
  • Coordinates required qualified persons
  • Prepares a proposed work plan
  • Collects applicant and ownership documents
System Capacity Must Be Supported by the Account and Site: The published programme maximum does not automatically mean the applicant should install the largest possible system.

Which Solar ATAP Documents Does the RPVSP Help Prepare?

Document or Information General Purpose Typical Coordination
Applicant Profile Identifies the registered consumer or organisation Applicant and RPVSP
Project Information Describes the site, electricity account and proposed project RPVSP
Technical Information States the proposed modules, inverter, capacity and system details RPVSP and relevant technical party
Proposed Work Plan Sets out the expected project implementation stages RPVSP
Identity or Registration Documents Supports ownership and applicant verification Applicant
Latest Electricity Bill Supports account, tariff and consumption verification Applicant
Single-Line Diagram Shows the proposed electrical-system arrangement RPVSP with the required competent and qualified persons
Structural or C&S Drawing Supports the proposed physical solar installation RPVSP and relevant qualified professional
CCC, CAS or PSS Approval Confirms the applicable connection assessment before submission RPVSP, utility and appointed technical party
The Applicant Must Still Provide Accurate Information: Appointing an RPVSP does not remove the applicant’s responsibility to provide correct ownership, account, company and site information.

Why Does the RPVSP Coordinate Technical Studies?

Some proposed Solar ATAP capacities require a technical assessment before the application can proceed. The applicable study depends on the consumer category, supply type, installed capacity and voltage level.

Project Situation Technical Requirement Published Study Fee
Domestic single phase above 5 kW Connection Confirmation Check RM1,000
Domestic three phase above 15 kW Connection Confirmation Check RM1,000
Non-domestic from 1 kW to 72 kW No CAS listed under the standard workflow table No study fee listed
Non-domestic above 72 kW to 180 kW Connection Assessment Study RM1,000
Non-domestic above 180 kW to 425 kW Connection Assessment Study RM5,000
Non-domestic above 425 kW to 1 MW Connection Assessment Study RM8,000
High-voltage connection Power System Study RM15,000
The Study Is a Mandatory Prerequisite Where Required: The RPVSP should not submit an application that requires a CCC, CAS or PSS before the relevant approval has been obtained and remains valid.

What Is the RPVSP’s Role in the eATAP Submission?

1

Check Eligibility

The applicant and provider review the electricity account, tariff, existing solar registration and project category.

2

Confirm Capacity

The proposed system is checked against the domestic limit or non-domestic Maximum Demand and 1 MW limit.

3

Complete Studies

The required CCC, CAS or PSS is coordinated before submission where applicable.

4

Prepare Documents

Applicant, project, technical, drawing and work-plan information is compiled.

5

Submit through eATAP

The application is entered through SEDA Malaysia’s Solar ATAP online system.

6

Respond to Verification

The provider updates incomplete information or responds to application queries where required.

Application Fee Timing Matters: The official workflow states an eATAP application fee of RM7.50 per kW, payable within seven days. Failure to complete the payment may cause the system to reject the application.

What Does the RPVSP Do after Solar ATAP Approval?

The RPVSP’s role does not normally end when the e-certificate is issued. The approved project must still be installed, tested, commissioned and connected under the applicable procedures.

  • Confirms that approval conditions are understood
  • Finalises the approved system design
  • Coordinates procurement of approved equipment
  • Schedules installation work
  • Coordinates electrical installation
  • Coordinates structural installation
  • Ensures required labels and protection are installed
  • Coordinates testing and commissioning
  • Prepares commissioning records
  • Coordinates applicable licensing procedures
  • Requests the bi-directional meter process
  • Submits the Solar ATAP contract where required
  • Coordinates meter inspection or replacement
  • Supports confirmation of commercial operation
  • Updates the eATAP process where required
  • Provides project handover documents
The Approved Capacity and Equipment Matter: Material changes to the approved design should not be made informally without checking the required approval and documentation process.

Does the RPVSP Replace Other Qualified Professionals?

No. The RPVSP coordinates the solar project, but other registered or qualified parties may still be required depending on the system size, voltage, structure and licensing requirements.

Party General Role
RPVSP Coordinates the Solar ATAP application and solar-project delivery
Competent Person Performs or endorses electrical duties within the applicable competency and legal scope
Qualified Person Provides the applicable professional or technical endorsement
Wireman Performs applicable electrical work for systems within the permitted competency scope
Professional Engineer Supports engineering design and endorsement where required, including larger projects
Structural or C&S Professional Reviews or endorses relevant structural installation drawings
TNB Handles applicable connection assessment, contract, meter and electricity-billing procedures
SEDA Malaysia Implements the Solar ATAP application process and issues the relevant e-certificate
Energy Commission Provides the regulatory framework and applicable licensing or exemption procedures
One Company Name Does Not Replace Required Credentials: Applicants should confirm which named individuals and contractors will perform or endorse each regulated technical task.

What Does SEDA Registration Not Guarantee?

  • Automatic Solar ATAP approval
  • Approval of the full proposed capacity
  • The lowest market price
  • The highest possible electricity savings
  • A specific payback period
  • Flawless installation workmanship
  • Zero roof-leak risk
  • Zero equipment failure
  • Manufacturer warranty approval
  • Free labour for every warranty claim
  • Unlimited O&M support
  • Permanent registration status
  • Long-term company financial stability
  • Immediate response to every service request
  • Suitability of every proposed equipment brand
  • Accuracy of unsupported sales promises
Registration Is a Starting Verification Point: Applicants must still review the company’s current directory status, proposal, contracts, track record, qualified personnel, insurance, warranties and after-sales capability.

How Can Applicants Verify an RPVSP?

1

Check the SEDA Directory

Search the current Registered PV Service Provider directory on SEDA Malaysia’s official website.

2

Match the Legal Company Name

Confirm that the proposal and invoice use the same legal entity shown in the directory.

3

Check the Registration Period

Confirm that the provider’s registration is current for the relevant application period.

4

Request the Certificate Number

Ask the provider to state its applicable RPVSP registration details in the proposal or application records.

5

Verify Technical Parties

Check the electrical contractor, competent person, wireman or engineer assigned to the project.

6

Use the Correct Contracting Entity

Avoid paying an unrelated entity that does not match the quoted, registered or contracted provider.

Verify before Paying a Deposit: The registration check should be completed before signing the contract or transferring money.

Registered Provider vs Unregistered Solar Seller

Comparison Item SEDA-Listed RPVSP Unregistered Seller or Referral Agent
SEDA Directory Listing Should appear in the applicable current directory May not appear
Solar ATAP Application Role Can be identified as the RPVSP in the application process May need to pass the project to another company
Application Accountability Named company details can be recorded in the application Responsibility may be unclear
Technical Coordination Expected to coordinate relevant design, documents and technical parties May only provide sales or referral services
Contracting Risk Still requires complete commercial and technical due diligence Additional risk if the actual installer is not disclosed
Registration Guarantee Registration does not guarantee price, quality or approval No RPVSP registration assurance
Ask Who Will Actually Submit and Install: A salesperson, marketing company or referral agent may not be the RPVSP or the company responsible for the installation contract.

How Should Applicants Compare Registered PV Service Providers?

  • Current SEDA RPVSP directory status
  • Exact legal contracting entity
  • SSM company details
  • Years of solar-project experience
  • Residential or commercial project experience
  • Experience with the proposed system capacity
  • Assigned competent person or engineer
  • Electrical-contractor registration
  • Solar module brand and model
  • Inverter brand and model
  • Mounting-system specifications
  • Roof-waterproofing method
  • Generation-estimation assumptions
  • Self-consumption and export assumptions
  • Workmanship-warranty period
  • Product and performance warranties
  • Labour coverage for warranty claims
  • Monitoring and O&M support
  • Application and technical fees
  • Payment milestones
Compare More Than the Total Price: A lower quotation may exclude application fees, technical studies, meter work, structural assessment, monitoring, warranty labour or long-term maintenance.

What Is the Difference between Solar100 and an RPVSP?

Solar100 Registered PV Service Provider
Explains the general Solar ATAP provider requirement Checks the applicant’s project-specific eligibility
Helps users discover and compare participating providers Designs and prices the proposed solar system
Highlights documents and questions to review Prepares project and technical information
Does not prepare official engineering drawings Coordinates drawings and endorsements with qualified parties
Does not submit the official eATAP application Submits and manages the applicable eATAP application
Does not install or commission the system Performs or coordinates installation and commissioning
Does not issue Solar ATAP approval Supports the application but cannot guarantee approval
Does not provide the installer’s warranty Provides contractual responsibilities and workmanship terms
Solar100 Is a Discovery and Comparison Platform: The appointed RPVSP remains responsible for its own proposal, application, design, installation, warranties and contracted services.

What Should Applicants Ask before Appointing an RPVSP?

  1. Is your company currently listed in SEDA’s RPVSP directory?
  2. What is the exact legal company name in the directory?
  3. What is your current RPVSP registration number?
  4. Which company will sign my installation contract?
  5. Which company will issue the invoice?
  6. Which company will submit the eATAP application?
  7. Who is the assigned competent person?
  8. Who is the assigned wireman or professional engineer?
  9. Which registered electrical contractor will perform the work?
  10. Does my capacity require a CCC, CAS or PSS?
  11. Who pays the technical-study fee?
  12. Is the RM7.50 per kW application fee included?
  13. Which application documents are included?
  14. Who prepares and endorses the single-line diagram?
  15. Who prepares the structural drawing?
  16. What happens if the approved capacity is lower?
  17. Who coordinates the Solar ATAP contract?
  18. Who coordinates the bi-directional meter?
  19. Who performs testing and commissioning?
  20. What workmanship and O&M support is provided?
Request Written Responsibility and Fee Details: The proposal should clearly state who handles each application, engineering, utility, installation, meter, commissioning and warranty task.

What Should Be Prepared before Contacting an RPVSP?

  • Recent TNB electricity bills
  • TNB account number
  • Registered account-holder details
  • Property address
  • Applicant’s MyKad or company information
  • Domestic or non-domestic tariff category
  • Single-phase or three-phase supply
  • Supply-voltage level
  • Maximum Demand records, where applicable
  • Monthly electricity consumption
  • Daytime load information
  • Operating hours
  • Roof photographs
  • Roof dimensions
  • Main switchboard photographs
  • Existing meter photographs
  • Existing solar registration, if any
  • Future electricity-demand plans

Frequently Asked Questions

Is an RPVSP required for a Solar ATAP application?

Yes. The official domestic and non-domestic Solar ATAP workflows require the applicant to appoint a Registered PV Service Provider.

Where can applicants find an RPVSP?

Applicants should check the current Registered PV Service Provider directory on SEDA Malaysia’s official website.

Does the RPVSP submit the eATAP application?

The RPVSP generally prepares and coordinates the required information and submits the application through the eATAP system.

Does an RPVSP guarantee Solar ATAP approval?

No. Approval depends on eligibility, complete documentation, technical requirements, connection assessment and official verification.

Can any solar salesperson act as the RPVSP?

No. The company identified as the RPVSP should match the applicable company listed in SEDA Malaysia’s current directory.

Does SEDA registration guarantee good workmanship?

No. Registration is an important verification point, but applicants must still evaluate the provider’s design, contract, track record, workmanship warranty and after-sales support.

The information on this page is provided for general educational and comparison purposes. It is not an official Solar ATAP approval, engineering design, legal interpretation, technical-study result, provider endorsement, contract recommendation or guarantee of system performance, savings, workmanship or approval. RPVSP registration status, application procedures, technical-study requirements, fees, licensing, qualified-person duties, meter procedures and documentation requirements depend on the latest official guidelines and the applicant’s project conditions. Solar100 is a solar discovery and comparison platform. It is not SEDA Malaysia, the Energy Commission, TNB, an RPVSP, solar installer, electrical contractor, engineering consultant, regulator or government authority. Applicants should verify the provider’s current official-directory status and review the complete written proposal and contract before making payment.