What Documents Are Required for a Solar ATAP Application?

Solar100 Malaysia Solar ATAP Document Guide

What Documents Are Required for a Solar ATAP Application?

Updated: July 2026

A Solar ATAP application requires documents that confirm the legal applicant, registered electricity account, proposed solar PV system, electrical design, structural installation arrangement and applicable grid-connection approval. The exact checklist depends on whether the applicant is an individual, company, organisation, government entity, domestic consumer, non-domestic consumer or existing solar participant.

Quick Answer Common Solar ATAP documents include the applicant’s MyKad or passport, an SSM report or other registration document for a non-individual applicant, the latest TNB electricity bill, an AC/DC single-line diagram endorsed by the relevant Competent Person and SEDA Malaysia Qualified Person, an endorsed civil and structural drawing for the solar PV installation, and CCC, CAS or PSS approval where the project exceeds the applicable technical threshold. Additional documents may include company-authorisation records, competency certificates, electrical-contractor registration, property- owner consent, tenancy documents, existing NEM or SelCo records, equipment specifications and declarations required through eATAP.
SEDA-Related Standards Review
SSM Registration Information Review
Policy & Application Process Review
After-Sales Support Assessment
Consultation & Quotation Comparison

What Is the Core Solar ATAP Document Checklist?

The official Solar ATAP application workflow identifies several core documents that normally form the basis of an eATAP submission. These records allow the application reviewers to verify the applicant, account, installation design and technical prerequisites.

Applicant Identification

MyKad, passport, SSM report or another recognised registration or incorporation document.

Latest Electricity Bill

Confirms the registered TNB account, account holder, premises address and applicable tariff category.

Single-Line Diagram

Shows the electrical configuration, equipment, protection and point of connection for the proposed solar PV system.

C&S Installation Drawing

Shows the physical solar-panel layout, supporting structure and relevant civil or structural installation details.

Technical-Study Approval

CCC, CAS or PSS approval is required where the proposed project crosses the applicable capacity or voltage threshold.

Competency Records

Confirms that the relevant electrical design, declaration and technical documents are prepared or endorsed by appropriately qualified parties.

  • Applicant’s MyKad or passport
  • SSM report for a company or business applicant
  • Registration or incorporation certificate where applicable
  • Authorised representative’s identification
  • Company-authorisation letter or resolution
  • Latest TNB electricity bill
  • AC/DC single-line diagram
  • Solar PV plant-layout drawing
  • Endorsed C&S installation drawing
  • Detailed engineering design where required
  • Installed-capacity calculations
  • Equipment-efficiency calculations where required
  • Solar-panel specifications
  • Inverter specifications
  • CCC report and approval where applicable
  • CAS report and approval where applicable
  • PSS report and approval where applicable
  • Competent Person certificates
  • SEDA Malaysia Qualified Person certificate
  • Electrical-contractor registration certificate
  • Property-owner consent where applicable
  • Tenancy agreement where applicable
  • Applicant declaration
  • Electrical-contractor declaration
The Exact Checklist Is Project-Specific: A small domestic installation may require fewer supporting records than a large commercial, industrial or high-voltage project.

Which Applicant Identity and Registration Documents Are Required?

The applicant must provide evidence showing who legally owns or controls the application. The appropriate document depends on the applicant’s legal structure.

Applicant Type Common Supporting Document What It Should Confirm
Malaysian Individual MyKad Full legal name and identification number.
Non-Malaysian Individual Passport and applicable supporting records Identity and authority to make the application.
Company or Business Entity Current SSM registration or company report Registered name, registration number and legal status.
Body Corporate or Organisation Certificate from the relevant constituting authority That the organisation was lawfully constituted.
Educational Institution Applicable registration issued by the relevant education authority The institution’s recognised registration status.
Religious School Registration issued by the relevant religious authority The legal registration of the school.
Ministry or Government Entity Supporting establishment or authority document The entity’s legal establishment and authorised representative.

Non-individual applicants may also need:

  • Current SSM company profile
  • Certificate of incorporation
  • Business-registration certificate
  • Registered business address
  • Director or authorised-signatory information
  • Board resolution where applicable
  • Letter authorising the eATAP representative
  • Representative’s MyKad or passport
  • Representative’s designation
  • Organisation stamp where required
  • Applicant declaration
  • Authorised-signatory declaration
The Applicant Name Must Be Consistent: The legal name shown on the identity or registration document should match the eATAP applicant profile, authorisation records and other supporting documents.

What Electricity-Account Documents Are Required?

A recent electricity bill is one of the core Solar ATAP supporting documents because participation is linked to the registered TNB consumer and the relevant electricity account.

Latest TNB Electricity Bill Used to verify the account number, registered consumer, premises address, tariff and recent billing information.
Account-Holder Authorisation May be needed when the person handling the project is not the same person or entity named on the electricity account.
Maximum-Demand Records Relevant for non-domestic projects where the proposed capacity is linked to registered or measured maximum demand.
Existing Meter Information Helps confirm the supply arrangement, phase, meter category and proposed bidirectional-meter requirements.

The electricity-account records should allow the provider to verify:

  • TNB electricity-account number
  • Registered consumer name
  • Premises address
  • Domestic or non-domestic classification
  • Tariff category
  • Low-, medium- or high-voltage supply
  • Single-phase or three-phase supply
  • Current meter arrangement
  • Whether the meter is a direct TNB meter
  • Whether the account is a tenant sub-meter
  • Maximum demand where applicable
  • Recent electricity consumption
  • Existing solar billing status
  • Existing NEM or SelCo participation
Do Not Use an Unrelated Electricity Bill: The electricity bill should belong to the same premises, account and applicant arrangement used in the Solar ATAP application.

What Technical Design Documents Are Required?

Solar ATAP technical documents describe how the system will generate, convert, protect and connect electricity. They should be prepared and endorsed by the appropriate Competent Person and SEDA Malaysia Qualified Person where required.

Technical Document Main Purpose Typical Information
AC/DC Single-Line Diagram Shows the complete electrical configuration. PV strings, inverter, protection, isolators, distribution board, meter and connection point.
Detailed Engineering Design Explains how the proposed system was designed. Capacity calculations, equipment selection, cable sizing, protection and efficiency assumptions.
Solar PV Plant Layout Shows the physical location of major equipment. Panel arrangement, inverter location, access routes and cable paths.
Installed-Capacity Calculation Supports the capacity entered into eATAP. Number of panels, panel wattage, DC capacity and inverter AC capacity.
Equipment Schedule Identifies the proposed solar equipment. Manufacturer, model, quantity, rating and certification information.
Protection Details Shows how the installation will protect people, equipment and the grid. Overcurrent, surge, earth-fault, anti-islanding and isolation arrangements.

The single-line diagram should generally be checked for:

  • Solar-panel quantity and rating
  • Total DC installed capacity
  • Inverter quantity and rating
  • Total inverter AC capacity
  • String configuration
  • DC isolators
  • AC isolators
  • Overcurrent protection
  • Surge-protection devices
  • Earthing arrangement
  • Distribution-board connection
  • Point of interconnection
  • Existing electricity meter
  • Proposed bidirectional meter
  • PV meter where applicable
  • Anti-islanding protection
  • Cable types and sizes
  • Competent Person endorsement
  • Qualified Person endorsement
  • Drawing number and revision date
Capacity Must Match Across the Submission: The quotation, eATAP form, single-line diagram, layout drawing, technical study and equipment schedule should use the same approved system capacity.

What Civil and Structural Documents Are Required?

The Solar ATAP workflow identifies an endorsed civil and structural drawing for the solar PV installation as a supporting document. The drawing should reflect the actual installation location and proposed mounting arrangement.

Roof Layout

Shows where the panels will be placed in relation to roof boundaries, ridges, valleys and existing obstructions.

Mounting Arrangement

Shows the proposed rails, brackets, supports, anchors or structural framing used to secure the solar panels.

Structural Details

May include loading, attachment, support or reinforcement information required for the proposed installation.

Access and Clearance

Shows practical access, maintenance spacing and relevant safety clearances around the installation.

  • Property or building reference
  • Roof plan
  • Solar-panel arrangement
  • Panel orientation
  • Panel tilt where applicable
  • Mounting-system type
  • Rail and bracket arrangement
  • Proposed fixing points
  • Structural-support details
  • Existing roof obstructions
  • Roof-edge clearances
  • Maintenance walkways
  • Inverter location
  • Cable routes
  • Drawing scale
  • Drawing revision
  • Relevant endorsement
  • Additional structural calculation where required
A Layout Image Is Not Automatically an Endorsed C&S Drawing: A sales illustration or satellite image may help explain the proposal but may not replace the formal installation drawing required for the application.

When Are CCC, CAS or PSS Documents Required?

The applicable grid-connection document depends on the consumer category, supply phase, voltage level and proposed solar PV capacity. Where required, the approval is a mandatory prerequisite before the Solar ATAP application proceeds.

Project Category Published Threshold Supporting Approval
Domestic Single-Phase More than 5 kW CCC report and approval.
Domestic Three-Phase More than 15 kW CCC report and approval.
Non-Domestic LV or MV More than 72 kW CAS report and approval.
High-Voltage Installation Based on the applicable connection category PSS report and approval.
Domestic Group Based on the aggregated supply and capacity CAS may be required during the electricity-supply application stage.
CCC Report Records the Connection Confirmation Check undertaken for an applicable domestic system.
CCC Approval Confirms acceptance of the proposed domestic connection subject to the stated conditions.
CAS Report and Approval Evaluates the connection impact of an applicable non-domestic or grouped project.
PSS Report and Approval Provides the required power-system assessment for an applicable high-voltage project.

The technical-approval document should be checked for:

  • Correct applicant
  • Correct electricity account
  • Correct project address
  • Correct connection category
  • Correct proposed capacity
  • Correct inverter capacity
  • Applicable approval conditions
  • Required network modifications
  • Required protection settings
  • Study reference number
  • Approval date
  • Validity period
  • Utility endorsement
  • Supporting study report
A Technical Approval Does Not Replace the eATAP Application: CCC, CAS or PSS approval supports the application but does not by itself issue a Solar ATAP e-Certificate.

Which Competency and Contractor Documents May Be Required?

Solar ATAP submissions may require evidence that the design, electrical work and declarations involve appropriately registered or competent parties.

Certificate or Record Purpose Who It Relates To
Electrical-Contractor Registration Confirms registration as an electrical contractor. The appointed electrical contractor.
Competent Person Certificate Confirms the person’s recognised electrical competency. The person preparing, endorsing or declaring the electrical work.
Professional Engineer Registration May support the relevant electrical engineering appointment. A Professional Engineer registered with the Board of Engineers Malaysia.
Wireman Competency Certificate Confirms the applicable competency issued by the Energy Commission. The appointed Wireman where relevant.
SEDA Malaysia Qualified Person Certificate Confirms recognised GCPV system-design qualification. The person endorsing the solar PV system design.
Electrical-Contractor Declaration Records the contractor’s formal declaration for the application. The company and appointed Competent Person.
  • Certificate holder’s full name
  • MyKad or passport number
  • Certificate number
  • Registration category
  • Scope of competency
  • Issuing authority
  • Certificate validity
  • Employer or company name
  • Company-registration number
  • Electrical-contractor registration number
  • Professional registration where applicable
  • Qualified Person certificate
  • Signature
  • Company stamp where required
Registration Should Be Valid When the Application Is Submitted: Expired or unrelated certificates may cause the application to be returned for correction.

Are Property Ownership or Landlord Documents Required?

The core Solar ATAP workflow focuses on the registered electricity consumer and technical application. However, property, roof and landlord documents may be necessary where the applicant does not solely own or control the installation site.

Owner-Occupied Property

Ownership or property records may be requested where account, applicant or installation rights need clarification.

Rented Property

A tenancy agreement and written landlord consent may be required before permanent solar equipment is installed.

Strata or Managed Property

Approval from the relevant management body may be needed for roof, common-area or access rights.

Third-Party-Owned System

A PPA, lease or equipment-ownership agreement may be required to explain the relationship between the consumer and system owner.

  • Property-ownership record where required
  • Tenancy agreement
  • Landlord consent letter
  • Roof-use consent
  • Building-management approval
  • Joint-management-body approval where applicable
  • Management-corporation approval where applicable
  • Access authorisation
  • PPA agreement where applicable
  • Solar lease agreement where applicable
  • Equipment-ownership agreement
  • Maintenance-access rights
  • Contract-transfer conditions
  • Removal obligations
  • Roof-repair responsibilities
  • Insurance responsibilities
A TNB Account Does Not Automatically Prove Roof Ownership: Applicants should resolve property and installation rights before committing to the project.

What Documents May Be Needed for an Existing Solar System?

Applicants with an existing NEM, SelCo, self-consumption or other generation arrangement may need additional documents to establish the current programme status and any required termination or conversion route.

Existing Arrangement Possible Supporting Documents Reason for Review
Existing NEM NEM approval, contract, commencement and remaining-tenure records To determine whether formal termination or conversion is required.
Existing SelCo SelCo registration, system documents and utility records To confirm the existing self-consumption arrangement.
Existing Solar PV System As-built SLD, panel and inverter schedule, commissioning records To verify the existing capacity and proposed modification.
Existing Generator Generator details, licence, connection and operating arrangement To assess whether the account is subject to a programme exclusion.
System Capacity Increase Current approval, proposed revised design and new technical assessment To confirm whether an amendment and additional approval are required.
  • Existing NEM approval
  • Existing NEM contract
  • Remaining NEM tenure
  • Existing SelCo registration
  • Existing system capacity
  • Existing panel schedule
  • Existing inverter schedule
  • Existing single-line diagram
  • Existing meter arrangement
  • Existing commissioning records
  • Existing generation licence
  • Existing generator information
  • Termination record where required
  • Conversion approval where required
  • Revised technical design
  • Revised connection approval
Do Not Remove Existing Programme Records: Previous approvals, contracts and commissioning documents may be needed to support a Solar ATAP conversion or system amendment.

How Should Solar ATAP Documents Be Prepared?

Documents uploaded through eATAP should be complete, readable, current and consistent. Poor file quality or conflicting information can lead to an update request or rejection.

1

Use Current Documents

Check that identity, registration, bill and competency records remain current and valid.

2

Scan Every Page Clearly

Avoid cropped edges, missing pages, shadows, blurred text and hidden signatures.

3

Use Consistent Names

Ensure the applicant, account holder, company and representatives are correctly identified throughout the submission.

4

Use Consistent Capacity

Check that the eATAP form, design, study and quotation show matching system capacities.

5

Confirm Endorsements

Make sure every drawing or declaration that requires a signature, certificate or stamp has been properly endorsed.

6

Keep a Complete Copy

Retain the final application package, payment receipt, approvals, e-Certificate and later commissioning records.

File Names Should Be Clear: Descriptive names such as “Latest-TNB-Bill,” “Endorsed-SLD” and “CCC-Approval” can reduce document-selection errors.

Final Solar ATAP Document Review Checklist

Review Item What to Confirm Common Problem
Applicant Identity Legal name and identification details are correct. Different spelling across documents.
TNB Account Account number, consumer name and premises are correct. Bill belongs to another account or branch.
Installed Capacity DC and AC capacities match the submitted design. Quotation and SLD show different capacities.
SLD Endorsement Required Competent Person and Qualified Person endorsements are present. Unsigned or outdated drawing.
C&S Drawing Drawing matches the actual roof and mounting plan. Generic layout used for the wrong property.
Technical Approval CCC, CAS or PSS matches the site and capacity. Approval is expired or issued for another capacity.
Competency Certificates Certificates are valid and relate to the appointed parties. Expired or unrelated registration.
Applicant Authority The signatory is authorised to act for the applicant. Missing authorisation letter or board resolution.
Property Rights Required landlord or management consent has been obtained. Installation rights remain unresolved.
Declarations Applicant and contractor declarations are complete and signed. Missing signature, date or company stamp.
  • All required files are included
  • Every page is readable
  • No document is cropped
  • No required page is missing
  • Applicant names are consistent
  • Company names are consistent
  • TNB account number is correct
  • Premises address is correct
  • Tariff category is correct
  • System capacity is consistent
  • Panel model is consistent
  • Inverter model is consistent
  • Technical approval remains valid
  • Certificate registrations remain valid
  • Required signatures are present
  • Required stamps are present
  • Drawing revisions are current
  • Property consent is complete
  • Declarations are completed
  • A complete copy is retained
Do Not Approve Submission Without Reviewing the Final Package: Applicants should ask the selected provider for a copy of the documents that will be uploaded under their name.

What Document Questions Should You Ask Before Signing?

  1. Which Solar ATAP documents are included in your quotation?
  2. Who prepares the eATAP supporting documents?
  3. Who checks my applicant identity documents?
  4. How recent must my TNB electricity bill be?
  5. Does the account name need to match the applicant exactly?
  6. Do I need an account-holder authorisation letter?
  7. Which SSM documents are required for my company?
  8. Do I need a board resolution?
  9. Who prepares the AC/DC single-line diagram?
  10. Who endorses the single-line diagram?
  11. Who prepares the C&S installation drawing?
  12. Does the drawing require a structural calculation?
  13. Do I need CCC approval?
  14. Do I need CAS approval?
  15. Do I need PSS approval?
  16. Who prepares the technical study?
  17. Who pays the technical-study fee?
  18. How long is the technical approval valid?
  19. Which Competent Person certificate is required?
  20. Which Qualified Person certificate is required?
  21. Is the electrical contractor currently registered?
  22. Do I need landlord consent?
  23. Do I need building-management approval?
  24. Are my existing NEM documents required?
  25. Are my existing SelCo documents required?
  26. Who prepares the applicant declaration?
  27. Who signs the electrical-contractor declaration?
  28. Will I receive a copy of the complete submission?
  29. Who corrects documents if eATAP requests an update?
  30. Are document amendments included in the quotation?

What Is Solar100’s Role in Solar ATAP Document Comparison?

Solar100

  • Supports solar-provider discovery
  • Helps organise initial applicant and project information
  • Supports initial quotation comparison
  • Helps identify differences in document scope
  • Does not prepare or endorse technical documents
  • Does not approve Solar ATAP applications

Selected RPVSP and Relevant Professionals

  • Confirm the project-specific document checklist
  • Prepare the system design and drawings
  • Coordinate Competent and Qualified Persons
  • Obtain applicable technical approvals
  • Upload and update documents through eATAP
  • Remain responsible for their agreed application scope

Frequently Asked Questions

What documents are required for a Solar ATAP application?

Common documents include the applicant’s identification or registration record, the latest TNB electricity bill, an endorsed AC/DC single-line diagram, an endorsed C&S installation drawing and CCC, CAS or PSS approval where applicable.

Does an individual applicant need to provide MyKad?

A Malaysian individual applicant generally provides MyKad, while a non-Malaysian applicant may need a passport and other applicable supporting records.

What company documents are required?

A company or business applicant commonly provides an SSM report or registration record, authorised-representative information and the applicable company-authorisation documents.

Is the latest TNB electricity bill required?

Yes. The published Solar ATAP workflow includes the latest electricity bill as a core supporting document.

What is a single-line diagram?

A single-line diagram shows the proposed solar PV electrical configuration, including the panels, inverter, protection, distribution connection, meters and point of interconnection.

Does the single-line diagram need endorsement?

The published checklist requires the SLD to be endorsed by the relevant Competent Person and Qualified Person.

Is a C&S drawing required?

Yes. The published application workflow lists an endorsed civil and structural drawing for the solar PV installation.

When is CCC approval required?

CCC approval applies to a domestic single-phase system above 5 kW or a domestic three-phase system above 15 kW under the published workflow.

When are CAS or PSS documents required?

CAS approval generally applies to an applicable non-domestic low- or medium-voltage project above 72 kW, while PSS approval applies to an applicable high-voltage project.

Does Solar100 prepare Solar ATAP application documents?

No. Solar100 supports provider discovery and quotation comparison. The selected Registered PV Service Provider and appointed professionals prepare, endorse and submit the required documents.

The information on this page is provided for general educational and comparison purposes and reflects publicly available Solar ATAP document requirements reviewed in July 2026. The actual supporting-document checklist depends on the applicant type, registered electricity account, tariff category, supply voltage, proposed capacity, property arrangement, existing solar status, technical-study requirement, licensing position and current eATAP fields. PETRA, the Energy Commission, SEDA Malaysia, TNB or other relevant authorities may revise the required forms, certificates, endorsements, technical thresholds, document formats and submission procedures. Applicants should confirm the latest checklist through the current eATAP system and the selected SEDA Malaysia Registered PV Service Provider. Solar100 is a provider-discovery and quotation-comparison platform. Solar100 is not PETRA, the Energy Commission, SEDA Malaysia, TNB, an approving authority, eATAP administrator, installer, Registered PV Service Provider, electrical contractor, Professional Engineer, Competent Person, Qualified Person, structural engineer or legal adviser and does not prepare, certify, endorse, submit or approve official application documents or guarantee application acceptance, technical approval, e-Certificate issuance, installation approval, electricity-bill savings or financial returns.

Compare Solar ATAP Document and Application Scope

Send your latest electricity bill, applicant type, property location, property type, registered account holder, supply type, existing solar status, proposed capacity and roof information to compare providers, document requirements, technical-study scope, eATAP responsibilities, installation coverage and after-sales support.