Solar ATAP Malaysia 2026|Eligibility, Application, Export Credits & System Size

Malaysia Solar Policy Guide 2026

Solar ATAP Malaysia 2026|Eligibility, Application, Export Credits & System Size

Solar ATAP is Malaysia’s rooftop solar programme for consumers who want to generate electricity for their own use and export eligible excess solar electricity to the grid. This guide explains the main requirements before homeowners or businesses request a quotation.

Solar ATAP at a Glance

Solar ATAP took effect on 1 January 2026 and applies to eligible electricity consumers in Peninsular Malaysia. Applications must be submitted through the official eATAP system by a SEDA Malaysia Registered PV Service Provider.

Main purpose Generate solar electricity primarily for self-consumption.
Excess electricity Eligible surplus solar electricity may be exported to the grid.
Application channel Applications are submitted online through the official eATAP system.
Programme period The Solar ATAP operating period may continue for up to 10 years.

Who Can Apply for Solar ATAP?

Solar ATAP is generally available to eligible existing electricity consumers in Peninsular Malaysia, subject to the official technical and programme requirements.

  • The applicant must be an existing registered electricity consumer
  • The electricity account must not be under a multi-tenant arrangement
  • The proposed solar installation must meet the applicable technical requirements
  • The application must be handled by a Registered PV Service Provider
  • The system must be installed within the same eligible premises

Consumers with an existing solar self-consumption system or previous solar programme contract may need to terminate the existing arrangement and comply with Solar ATAP requirements before joining.

Solar ATAP Residential System Size

Residential capacity depends on the property’s electricity supply and the outcome of any required technical assessment.

Electricity Supply Standard Capacity When Technical Approval Is Required
Single-phase residential Up to 5kW A Connection Confirmation Check is required for a proposed capacity above 5kW
Three-phase residential Up to 15kW A Connection Confirmation Check is required for a proposed capacity above 15kW
Non-domestic consumer Up to 100% of Maximum Demand Subject to network assessment and a maximum programme limit of 1MW

The final approved capacity may be lower than the requested capacity if roof space, electricity demand or local network conditions are unsuitable.

How Do Solar ATAP Export Credits Work?

Solar electricity generated at the premises is used by the consumer first. Eligible excess electricity that is not consumed on-site may be exported through the electricity supply system.

  • Domestic export credits are based on the applicable Energy Charge
  • Non-domestic export credits are based on the applicable Average System Marginal Price
  • Export credits are used within the same billing period
  • Unused export credits are not carried forward to the following billing period
  • Export credits cannot be used to offset every component of the electricity bill

Solar ATAP Is Not a Guaranteed Zero-Bill Programme

The main purpose of Solar ATAP is self-consumption. A suitable system should be designed around the property’s electricity demand rather than simply filling all available roof space with solar panels.

Fixed charges, non-energy charges, electricity usage at night and other tariff components may remain payable. Actual savings will depend on system generation, daytime usage, export value and the applicable electricity tariff.

Solar ATAP Application Process

1

Check the electricity account

Confirm the tariff category, account holder, single-phase or three-phase supply and latest electricity usage.

2

Appoint a registered solar provider

Select a SEDA Malaysia Registered PV Service Provider to assess the roof, design the system and prepare the application.

3

Complete the technical assessment

A Connection Confirmation Check, Connection Assessment Study or Power System Study may be required depending on the proposed capacity.

4

Submit the eATAP application

The registered provider submits the required documents and application through the official eATAP platform.

5

Installation, testing and meter arrangement

After approval, the system can be installed, tested and commissioned. A suitable bi-directional meter is required to record imported and exported electricity.

Documents Commonly Required

  • Latest electricity bill
  • Applicant identification or company registration documents
  • Solar system technical information
  • Single-line electrical diagram
  • Proposed installation and structural drawings
  • Required technical assessment approval, where applicable

The official Solar ATAP application fee is calculated according to the proposed installed capacity. Additional technical assessment, meter, licensing or installation costs may also apply depending on the project.

Check the Latest Official Requirements

Solar regulations, programme capacity and application procedures may be updated. Applicants should confirm the latest conditions with SEDA Malaysia, the Energy Commission and their appointed Registered PV Service Provider.

View Official Solar ATAP Information

Before Choosing a Solar ATAP Installer

  • Confirm that the provider is registered with SEDA Malaysia
  • Compare the proposed system capacity and annual generation
  • Check the exact panel and inverter models
  • Confirm whether eATAP application work is included
  • Review product, workmanship and roof-leakage warranties
  • Compare the savings calculation with your latest electricity bill

Check Your Solar ATAP Suitability

Estimate your solar system cost and potential return, check whether a battery may be suitable, or request recommendations for solar installers that cover your area.

Frequently Asked Questions

Can homeowners apply for Solar ATAP themselves?

The Solar ATAP application must be submitted through the official eATAP system by a SEDA Malaysia Registered PV Service Provider.

Can excess solar electricity be carried forward?

Export credits that are not used within the same billing period are not carried forward to later billing periods.

Does Solar ATAP require a solar battery?

No. A battery is not automatically required. Its suitability depends on night-time usage, backup power needs, budget and the homeowner’s objectives.

Important: This article provides general information and is not an official approval, guaranteed savings projection or solar quotation. Eligibility, capacity, application fees, export credits and technical requirements remain subject to the latest official guidelines and assessment by the relevant authorities.